Basic Info.
Machine Capacity
5-100tons Per Day
Reactor Raw Material
Q345r /Q245r , SS304, SS316L, Ss310s, Cr15
Land Required
450-1800 Square Meters as Capacity
Working Voltage
380V,415V,450V
Electricity Needed
40-120kw/H as Capacity
Fuel for Heating
Heavy Oil, Diesel Oil , Natural Gas, Coal, Firewoo
Heating Method
Directly Heating or Indirectly Heating
Discharge Method
Automatic
Labor Needed
4-8 as Capacity
Machine Weight
45-120 Tons as Capacity
Working Temperature
-20 to 400 Degree
Transport Package
10*40hq Containers
Production Capacity
200 Sets
Product Description
What is Oil Distillation Machine?
Oil distillation machine is machine that convert liquid waste oil into useful substances ( diesel oil ,gasoline
And slag or asphalt ) without releasing harmful.
Name | Useage |
Gasoline oil | 1. Sold directly 2. Used for engine |
Diesel oil | 1. Sold directly 2. Used for engine |
Slag | Sold directly |
Combustible gas | Heating the distillation machine. |
Flow Chart
3D Drawing
Model & Capacity
No. | Model | Capacity Per day | Note |
1 | MSD-5 | 5 tons | Take waste engine oil example |
2 | MSD-10 | 10 tons | Take waste engine oil example |
3 | MSD-20 | 20 tons | Take waste engine oil example |
4 | MSD-30 | 30 tons | Take waste engine oil example |
5 | MSD-40 | 40 tons | Take waste engine oil example |
6 | MSD-50 | 50 tons | Take waste engine oil example |
7 | MSD-100 | 100 tons | Take waste engine oil example |
Manufacture Workshop
Certifications
Running Machine Case
FAQ
Q1:Why buy from Us?
A: We can offer all these above things : Safety, environmental compliance, Energy-saving, good installation&worker training as well as Technical support&update Service.Because we have more than 10 years experience
Q2: What's the Wuarantee and after service
All the various series of the equipment we sell enjoy perfect after -sale service :
1. We will send engineers to help you with the installation of the machine and the training of your
workers until everything runs smoothly.
2. We guarantee the complete machine 18 months since installation. If during the 18 months, there is any
problem caused by the machine quality, we take responsibility.
Q3 :How long will it take to get the machine?
The delivery time around 25 days.