Basic Info.
Transmission
Mechanical Transmission
Drive Type
Internal Combustion Drive
Certification
CE, ISO9001: 2000
Cooling Method
Air Cooling
Transport Package
Wooden Pallet
Production Capacity
10000/Months
Product Description
Product Description
1. It has the advantages of fast speed, good control, convenient maintenance and so on.
2. Widely used in municipal construction, agricultural water conservancy, rural construction and other working conditions.
3. Internationally renowned Kubota supercharged engine, high power, good fuel economy.
Detailed Photos
Product Parameters
Model Information | MY50R |
Basic Performance Parameters |
Working Weight(kg) | | 1200 |
Bucket capacity(m³) | | 0.23 |
Travel speed low/high speed(Km/h) | | 0-2 |
Climbing ability(%) | | 30 |
Maximum Digging Height(mm) | | 2755 |
Maximum Unloading Height(mm) | | 2180 |
Maximum Digging Depth(mm) | | 1983 |
Max. digging radius(mm) | | 3318 |
Equipment Body |
Overall Length(mm) | | 2895 |
Overall Width(mm) | | 1210 |
Overall Height(mm) | | 2420 |
Bulldozer Width/Height | | 1370/236 |
Engine |
Engine Brand | | Rato |
Maximum power(Kw) | | 21 |
Cooling method | | Air Cooling |
Fuel Type | | Gasoline |
Certifications
One-stop experience and consumption needs
Packaging & Shipping
Company Profile
Our Advantages
FAQ
1. Are you a factory or trading company?
We are a factory. Our products are covered almost all farm machines and tractors parts, we can meet your any demands.
2.How can I get to your factory?
You can fly to Yancheng airport,we will pick you up.
3. How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality.
4. Can you do the design for us?
Yes. We have a professional team having rich experience in design and manufacturing. Just tell us your ideas and we will help to carry out your ideas into perfect Rotary Tillers
5.Do you have stock for all items?
In general, we have some stock, while if you need a bulk order, we still need time to produce it. Of course, we will inform all
details you before your payment.
6. What is your term of payment?
Usually T/T, L/C once place an order and sign contract, 70% balanced before shipping or against copy of bill of lading.