US$3.00-16.70
|
10 Pieces
(MOQ)
|
Basic Info.
Application
Electronic, Hardware, Machinery, Daily Use, Furniture, Household Applicances, Car
Certification
RoHS, ISO9001
Delivery Time
5-7 Working Day
Transport
Express / Sea / Air
Transport Package
Bubble Bag + Carton
Specification
standard custom
Production Capacity
50000PCS/Mouth
Product Description
Product Description
The ejector pin is a plastic mold accessory used in plastic molds. The ejector pin can also be called thimble, insert, middle needle, cradle, etc.
Detailed Photos
Product Name
| Ejector pin straight ejector pins
|
Material Details
| SKD11/SKD61/SKD51//ASP23/Vanadis/CPMRTXM4/HSS/A2,M2/D2/SUJ2/S45C
|
Standard
| Dayton/Lane/DIN/ISO/MISUMI/EDM/FIBRO//HASCO
|
Size
| Depend on your drawings or products standard
|
Surface Work
| TiCN, TiN, Aitain, Ticrn, nitriding , Black oxygened, Black coating etc available
|
Customized
| Available
|
Payment
| T.T Western Union , Paypal
|
Production address
| Dongguan, Guangdong, China
|
Delivery Time
| Stocks Now(Or 7-8 Days)
|
Transport
| DHL,Fedex,UPS,TNT or By Sea
|
Certifications
Strictly control the product quality and ensure that the products are 100% qualified.
Company Profile
Dongguan Jichun Mould Standard Parts Co., Ltd. was founded in 1997. 3 factories, 5 warehouses, 95 precision processing equipment, millions of product inventory. The factory is located in Dongguan, Guangdong Province, China. At present, it specializes in producing various stamping die parts, plastic die parts, automotive die parts, FA automation parts, various kinds of mechanical parts.
[Main Products] Guide Pins,Guide bush,Stripper Guide Pin,Stripper Guide bush,Holder Guide Post Sets,Ball Guide Post Sets For Die Sets,Plain Guide Post Sets For Die Sets,Guide Posts For Die Sets,Oil-Free Slide Plates,Punches & Dies,Punches,Punch Guide Bushings,Retainers,Coil Springs,Gas Springs
At the same time, we can manufacture according to the following criteria: Hasco / Misumi / DME / Pedrotti / Voest / Strack / Fibro / DIN / DAYTON / PUNCH / DANLY / Lmina.
FAQ
How to get a quote? Send us the model or drawing you want.
How long is the delivery time? Standard parts in stock and 7-12 working days.
How can you ensure the quality? We have QC department to control the quality from the begining of production until goods finish.
What is your terms of payment? Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
Danny Yang