US$35,000.00-60,000.00
|
1 Set
(MOQ)
|
Basic Info.
Model NO.
C/U50-100 Roll Forming Machine
Automatic Grade
Automatic
Model No.
Liming-Cu Purlin
Roll Forming Machine Product Name
Cu Purlin Roll Forming Machine
Roll Forming Machine Shaft Material
Cr12, Heat Treatment.
Roll Forming Machine Roller Material
Cr12, CNC Lathes, Heat Treatment.
Cutting Blade
Cr12MOV, Heat Treatment.
Voltage
380V /50Hz/3pH or as The Customer′s Requirements
Raw Material
Galvanized Steel
Material Thickness
1.5-3.0 mm
Transport Package
40hq*1+20gp*1
Origin
Fujian, China(Mainland)
Production Capacity
50 Set/Month
Packaging & Delivery
Package Size
11840.00cm * 1840.00cm * 2220.00cm
Package Gross Weight
20000.000kg
Product Description
This Profile Drawing As Below Picture:
General Parameter
1 | Item | Parameters |
2 | Size | 90mm |
3 | Material | Galvanized plate, aluminum plated zinc plate, color plate |
4 | Thickness | 0.3-0.6 mm |
5 | Yield Strength | 550 MPa |
6 | Feed Width | According to the profile |
7 | Forming speed | Approx.15 m/min |
8 | Roll Stages | 14 Stages |
9 | Main Motor Power | 15 KW (Servo Motor) |
11 | Shafts Diameter | ф75 mm |
12 | Electric Standard | According to local voltage |
13 | Control System | PLC |
14 | Cutting Blade Material | Cr12Mov,Heat Treatment |
15 | Shaft Material | φ75mm |
17 | Usage | Constrution |
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing. Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.