Basic Info.
Automatic Grade
Semiautomatic
Certification
GS, CE, RoHS, ISO 9001
r.p.m
50Hz(260-590) 60Hz(300-720)
Max. Drilling Dia. (mm)
10 mm
Range of Spindle Speed(r.p.m)
260 - 590 r.p.m
Video Outgoing-Inspection
Provided
Motor Power
3pH 6p 1.5kw (1/2HP)
Production Capacity
10000PCS/Year
Product Description
Product Description
Features
Designed for ease of use, even beginners can operate it seamlessly. Enjoy automatic cycle operations, an automatic reverse feature, and customizable tapping depth for precision work.
The main technical parameters
|
Speciflation
| GT2-223
|
Table Dimension
| 340*360mm
|
Dimension
| 730(L)×520(W)×820(H)
|
The head of the move from up and down
| 300mm
|
Spindle Diameter
| 70mm
|
Spindle Taper
| MT2
|
Distance from spindle to table
| 470mm
|
spindle travel
| 65mm
|
spindle speed
| 590/400/260
|
Motor power
| 1.5KW
|
tapping capacity
| M3-M16
|
weight
| 310KG
|
Hot Product
Company Information
FAQ
1. Can the drilling machine perform tapping operations as well?
No, the drilling machine is exclusively for creating holes.
2. Is the machine's spacing adaptable?
Indeed, it can be adjusted to meet various application needs.
3. Is the cutting tool prone to breaking?
If used correctly, the cutting tool is durable and resistant to breakage.
4: What information is needed if we require a non-standard machine?
Here is the detailed information we need from you:
1: A detailed drawing of your product.
2: Samples of your product.
3: Dimensions including height, width, and thickness of the product.
4: The maximum and minimum range of the holes.
5: The material's thickness and width, and the number of drilling and tapping holes required.
5: Can custom machines perform both tapping and drilling operations?
Yes, they are capable of handling both tasks efficiently.
6. Payment Terms
Upon contract signing, a 40% deposit is required for activation.
7. Production Scheduling
Full-scale production begins upon deposit receipt. CNC milling machines usually complete within 20 days, while automatic drilling and tapping machines are done within 15 days.
8. Packaging
We highly recommend wooden box packing to safeguard against transit damage.
9. Acceptance Check Upon receiving the goods, thoroughly inspect for any package damage, leaks, discrepancies in product quantity and accessories, and overall machine condition. If issues arise, photograph them and contact us right away.
10. Warranty Period
We offer a one-year warranty. Free components are provided the first year if damage is not intentional. We also provide lifetime maintenance. Post-warranty, customers cover component and shipping costs.
On-site debugging and training are available at the customer's cost. This includes covering airfare between China and the customer's location, plus providing complimentary accommodation and meals.
The 12-month warranty starts when the machine arrives. If issues occur, our engineers will visit your factory within 24 hours. We provide ongoing maintenance even after the warranty expires. Each CNC machine comes with comprehensive English instructions, including maintenance and operation manuals.
11. OEM Services
We welcome purchase orders featuring customers' brands or trademarks.