Basic Info.
Automatic Grade
Automatic
After-sales Service
12 Months
Raw Material
Polyester Fiber
Type
Pet Needle Punching Line
Final Products
According to Customers′ Requirement
Name
Cotton Fiber Opening Machine
Machine Type
Pet Needle-Punched Line
After-Sales Service Provided
Engineers Available to Service Machinery Overseas
Transport Package
Wooden Box
Production Capacity
10 Set/Sets Per
Packaging & Delivery
Package Size
2000.00cm * 1000.00cm * 17000.00cm
Package Gross Weight
1200.000kg
Product Description
Product Description
New Design with Tecnology PET Fiber Opening and Filling Machine Thermal Bonded Wadding Production Line Feature:
1. Photoelectric and electronic weighing system control
2. Automated operation and coordinated control.
3. Accurate quantitative feeding, adjustable setting range.
4. Simple and compact design, easy to operate, easy to maintain.Application:
Opening all kinds of fiber and weighing the fiber electronically,it can be combined with several units together to mix different type of fibers with different percentages.Transfer the material to per opener automatic by cross conveyer.
Detailed Photos
Specifications: |
Width: | 11100mm | 1300mm | 1500mm |
Capacity: | 150kg/h | 250kg/h | 350kg/h |
Power: | 4kw | 350kg/h | 5kw |
Packaging & Shipping
NUDE PACKING , WOODEN CASE IS OPTIONAL. CASE PACKING:CARDING MACHINE, LAPPER AND ELECTRIC BOXES WOODEN CASE PACKAGED.OTHER MACHINES NUDE PACKAGING.ANY DAMAGE IN TRANSPORT OF MACHINES IS NOT DUTY OF THE SELLER.
Company Profile
After Sales Service
Pre-Sales Service
* Inquiry and consulting support.
* Sample testing support.
* View our Factory.
After-Sales Service
* Training how to instal the machine, training how to use the machine.
* Engineers available to service machinery overseas.
FAQ
1. Are you factory or trading company? We are factory with export rights. We manufacture machines and export& nbsp ;to customers by ourself.
2.Do you have a separate after-sales team?
yes,we have it .we have 4peoples for after-sales
3.How to going to visit you factory ?
we near the shanghai ,by fast tran need 1:30hours .near yiwu,just 30min .