US$10.00-200.00
|
100 Pieces
(MOQ)
|
Basic Info.
WordPad Structure
Mounted
Usage
Church, Auditorium, Auditorium, Cinema, Station
Loading Port
Shenzhen Port
Transport Package
Knocked Down Packing
Specification
580*750*1010
Production Capacity
100, 000PCS/Year
Product Description
HJ-9942A
1. Seat & Back: Crafted from high-quality, cold molded injection polyurethane foam, our chairs offer a comfortable and supportive seating experience. The rear seat and back panels are made of multilayer wood veneer varnish finish, ensuring durability and a sleek, modern aesthetic.
2. Footrest: Our footrest is crafted from steel electrostatic powder coating black finish, providing an excellent grip and stability for added comfort during extended periods of use.
3. Sponge: The chair's high-density cold shapping PU foam sponge provides ample cushioning and support, ensuring maximum comfort and relaxation.
4. Material: Our chairs are constructed using fabric (specially treated with inflaming retarding, anti-pollutin, and anti-fading), man-made leather, or genuine leather. This ensures that they are not only comfortable but also durable and long-lasting.
5. Armrest: Our armrests feature a combination of solid oak wood on top and plywood on the side board, offering both style and functionality.
6. Writing Tablet: Crafted from ABS, our writing tablets are equipped with a rotary mechanism made of aluminum, making them easy to operate and convenient for note-taking or presentations.
7. Site: Whether you're attending an auditorium, cinema, or any other event, our municipal cinema theatre seating and public high back chairs are designed to provide you with a comfortable and stylish experience. Our products are primarily used in auditorium chairs, cinema chairs, school furniture, office furniture, and waiting chairs.
Clothing | fabric or Pu leather, color optional |
Center distance | 580mm |
packing | knock down |
CBM/seat | 0.16 m³ |
Loading QTY | 20GP | 40HQ |
175PCS | 430PCS |
MOQ | 100 PCS |
Warranty | 5 years |
Payment item | 30% as deposit, balance to be paid before shipment |
Loading date | 15 to 18 days after receiving deposit |
Loading port | Shenzhen or Guangzhou |