Basic Info.
Type
Air Separation Plant
Separation Mode
Filter Type
Operating Type
Continuous Type
Centrifuge Type
Tube Centrifuge
Distillation Equipment Type
Steam Distillation Equipment
Extraction Tower Type
Vibration Plate Tower
Main Material
Carbon Steel or 304 Stainless Steel
Transport Package
Wooden Pallet
Production Capacity
50 Set/Month
Product Description
Cyclone classifier,nut grader,classifying cone ISO9001 & Ce Certificated High Quality Classifier
Our Main Products HTG series turbine classifier with secondary air and high-precision turbine, can be the most fine of up to 3 microns thin material, the use of special materials, rotor scalable high hardness materials, widely used in chemical, pharmaceutical, food, and other non-metallic minerals superfine powder processing industry in classifying, in addition to iron, selection and so on.
Technical Parameter
Model | Rotor Diammm | Rotor speedr/min | Rotor powerkw | Air volume | Capacity (kg/h) | comminution sizeum |
(m3/h) |
HTG-132 | 132 | 1100~11000 | 4 | 500 | 15~300 | 3~150 |
HTG-250 | 250 | 700~7000 | 5.5~7.5 | 2000 | 30~800 |
HTG-315 | 315 | 500~5000 | 7.5~11 | 3200 | 50~1500 |
HTG-400 | 400 | 450~4500 | 11~15 | 5000 | 100~3000 |
HTG-500 | 500 | 350~3500 | 22~30 | 7000 | 200~4500 |
HTG-630 | 630 | 250~2500 | 30~37 | 9000 | 300~6000 |
HTG-800 | 800 | 150~1500 | 37~45 | 12500 | 400~8000 |
FLOW CHART
Related Engineering Cases
Technical support
Upon receiving the deposit, we will offer the following technical services:
1. Design for your production line flow and equipment layout, free of charge;
2. Provide foundation drawings of customer-ordered grinding mills and drawings of related parts, etc;
3. Technical parameters of peripheral equipment will be supplied;
4. Free technical suggestions on adjusting of equipment layout and application.
5. Equipment upgrading (customers need to pay the cost);
Quality assurance
1. Strictly conforming to ISO9001-2000 quality management system;
2. Strict control from purchasing inspection, process inspection to final proofing;
3. Established several QC departments to execute quality control regulations;
4. Detailed quality control examples:
(1) Complete files for quality control and quality feedback;
(2) Strict inspection for the components of our grinding mills, to assure products free of damage and avoid rust-eaten and paint peeling off later on.
(3) Only qualified components will be assembled and total equipment must be inspected completely before sale.
After sale service
1. We will send our technician to the site for guiding equipment installation and commissioning.
2. During the installation and commissioning, we offer operator training service.
3. The quality assurance date is one year after commissioning. And after that, we will collect the cost if provide repairing for your equipment.
4. Maintenance for equipment failure caused by improper handling (appropriate cost will be collected).
5. We offer the components with favorable price and perdurable maintenance.
6. If equipment repairing is needed after quality assurance date is expired, we will collect maintenance cost.