Basic Info.
Door Material
Board/Steel/Aluminum/Customized
Table Material
Quartz/Marble/Granite
Drawer Guide Rail Kind
Three Section Track
Certification
CE, ISO9001, RoHS, CCC
Door Panel Surface
Lacquer/Melamine/Tmber Veneer/Painted/Stain/PVC
Countertop Material
Artificial Quartz, Granite, Marble
Size
Customized Plan Drawing Size
Material
Solid Wood\Particleboard\Plywood\PVC\MDF\HPL
Hardware
Chinese Top Brand/Dtc/Blum
Accessories
Backsplash, Drawer Basket, Drawer Slide, Faucet,
Handles
45 Cut/Invisible/Aluminum/Classic
Transport Package
Flat Package
Production Capacity
3000 Sets/Month
Product Description
Product Description
Kitchen Cabinet Apart | Material |
Kitchen Cabinet Carcase | 18mm MP board/Plywood |
Kitchen Cabinet Door | 18mm MDF with UV,PVC,acrylic,Lacquer,Laminate finish |
22mm solid wood with painting |
Kitchen Cabinet Countertop | 20mm Marble,Granite or Quartz stone with 20 mm Laminated Edge |
Kitchen Cabinet Hardware | International Brand : Blum hinge system and pull out system |
Chinese Brand: DTC hinge system and pulled out system |
Soft closing hinges with buffer |
Function Accessaries | Sink,faucet,pull out basket,handle |
Detailed Photos
Certifications
Packaging & Shipping
Company Profile
History: ACE Architectural Products Co.,Ltd-railing and staircase pioneer in China,specialized in railing and staircase design and production since2010.
Work shop: 7500 square meters workshop, advanced CNC machine work line.
Turnover: 20 million US dollar. Main
market: America,Europe,Australia and middle east.
Quality level: High level.
Target customers: Developers,Builders,Contractors.
Target projects: High end quality residential houses,shopping centers,resorts,airports,embassies,public projects.
Service: Design,shop drawing,production,shipping,installation instruction. Factory Photo
FAQ Q1:Why do you choose us?
Our company focus on the design and manufacture the stairs and railings for more than 10 years.
Q2: What information you should offer to quote?
All the railing can be custom made in our factory, Please provide us your drawing, then we can quote it according to your drawing.
Q3:What is about the delivery time?
Once the railing finished production and trial installation we will pack and send to you, it takes around 45 days.
Q4:What guarantee we can offer to you?
Our products will have 5 years guarantee, all fitting can be changed within 5 years if our quality problems.