Basic Info.
Type
Piston Filling Machine
Automatic Grade
Automatic
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Capacity Cup
Filling Principle
Atmospheric Pressure
Packaging Container Lifting Structure
Pneumatic Lifting
Packaging Material
Composite Materials
Delivery Capacity
10-50 Ton/H
Screw Conveyor
323mm*(2-10m)
Bulk Cement Loader Flexible Range
1.2m Can Be Customized
Dust Collector 2
Air-Jet Type with Fan
Specification
accordingly
Production Capacity
5000 Sets/Month
Product Description
Item | Specifications | item | Specifications |
Hopper | 3m³ | Bulk cement loader flexible range | 1.2mThe length can be customized |
Delivery capacity | 50 ton/h | Dust collector | Configuration fan is 4KW |
Screw conveyor | 323mm*10m | Wheels | Enlarge the car tires and widen the brackets |
Filtration area | 24m2 |
Wind capacity | 2400m³/h |
Cleaning method | Pulse air-jet cleaning continuous working |
Filtration efficiency | >99.9% |
Noise | <75dB |
Compressed air | 4-6 bar |
Model | Square type |
Fan | 4KW |
The Type: Mobile and Semi-MobileThe speed: 30 - 60t/h per machineApplication: Cement, fly ash, starch, sugar, salt, sand, plastic pellets, oats, polymers, lime, soda ash, plastic resin, plastic powder, dry milk, and feeds Full Process Solution Provider SDCAD
Q: Are you trading company or manufacturer?
A: We are factory. We can design and manufacturer products with our patent. Welcome to visit us to check it!
Q: What are the terms of payment in your formal trade?
A:Normally we can work on T/T term ,L/C term . T/T: 30%T/T prepayment , 70% paid by T/T before delivery. L/C: 100% irrevocable L/C at sight.
Q: What's your after-sale service?
A:12 months warranty for main parts since departure. On-site installation, debugging, workers training. Make sure that your workers operate properly and know daily maintenance well.
Q:What's your delivery time?
A:The goods will be delivered in 30-45 days after the 30% of the total amout is paid as deposit, and maybe a little longer if busy in the factory.
B: Generally it is 7-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q. How long do you warranty your Bulk loding Machine?
A:We shall guarantee that the commodity for 1 year, excluding the wearing parts, and we will offer our customers the wearing parts all the time with favorable price.
Q: What should I do if I experience a problem on our equipment?
A: You could email us the photos to show what happens or call us, and our service line is available 24/7, and then we will feedback you immediately. Also on-site technician service available as request.
Q.How can we install the plant?
A:Our engineer will make installation drawing before we send the machine, and our engineer will go oversea to guide and train the installation after everything is already set in customer's construction site.
Q: Do you have CE certificate for your Bulk loding Machine?
A: Yes, we have. It is our patent products, certificated by CE.